Contact Us           Register Interest
Meditano Constructs
 
 
 
Interface
Project Portfolio Console has been designed to be simple to use, easy to navigate, and intuitive:
The project browser incorporates favourites for
quick access to your most important projects
The tabbed pages give quick access to grouped
information
Input methods include date pickers, drop down
boxes and large text input boxes for comprehensive
reporting
A familiar Windows feel ensures rapid proficiency in
accurate and speedy project updating and reviewing.
Reporting
As a project director, project sponsor or reviewer, you can see as much or as little information on your project portfolio as you choose:
The “My Projects” dialog gives an at-a-glance
snapshot of your projects’ status and key data
A Project Report shows more detailed information for
a specific project textually and graphically
The Tabbed pages in a project file contain all the
project reportable data.
Access Control
The program includes access control features to ensure everyone that needs access has the appropriate project visibility and editing rights:
Access can be granted to users at a level allowing the
simple viewing of project data and reports, to full
administrative rights
The access rights on specific projects for a user can
be tailored to accommodate different roles on projects, from resource, through project manager, to project director.
Financial Tracking
The PPC contains a robust system to track finances to ensure governance criteria are met:
Original and current budgets are recorded by Phase or
reporting entity
Actual and forecast costs are tabulated and displayed
graphically to show cost performance
Budget columns are summed automatically to reconcile
project budgets.
Schedule Tracking
A comprehensive facility to record and report against schedule and milestone dates ensures projects are managed with the right level of schedule and progress detail:
Schedule tasks are represented in a bar chart with
budgeted/approved data and actual/forecast data to
show project schedule performance by phase or
reporting entity
Actual progress and forecast progress are tracked
and displayed on a line graph
Milestones are listed, tracked and displayed for
efficient review.
Resources & Documentation
Project Resources can be nominated, and documents stored with version control:
Resources have a project specific role and access
level
assigned
Documents are loaded against the project, with
revision tracking to ensure an audit trail is preserved
Templates are available portfolio wide, and are
managed by administrators
Project Checklists can be customised to nominate the
documentation and processes required in a project,
and to track their completion.
 
 
Core Features
Fully Windows compliant
Remnant free self extracting installation file
Support for standalone installation and network installation
Simple Wizard for initial project entry, or manual entry using Tab system
Commonly understood Project Management terminology and algorithms
All field names are user editable for integration with company or corporate project delivery frameworks
Self checking functionality to reduce typographic errors.
Data Capacity
Any number of projects may be added to a portfolio, and any number of portfolios may be added to the system
The practical size limit will be governed by the database capacity, and the server and network bandwidth.
Requirements
Pentium Processor
1 Gb RAM minimum
VMWare/Citrix Compatible
Microsoft Windows XP and Vista compatible
Local Install
    • Dbase = SQL Express
    • HDD = 300Mb required
Server Install
    
• Dbase = SQL Server 2005
    • HDD= 100Mb required on Clients
  Contact Us
Send us an e-mail for
answers to your questions
  FAQ
View answers to our
most often asked questions.
  The Software
Find out how PPC will bring
visibility to your project portfolio.
  Buy Now
Purchase the software now
from our Secure on-line Store
Copyright © 2009 Meditano Constructs. Designed by: Keshav Infotech - Terms and Conditions